toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Shift Linkage, A/T > < Solenoid No. 1(+++)|Page 2295
Page 1
background image

Shift Solenoid: Testing and Inspection

1. INSPECT SOLENOIDS.

a. Disconnect the connector from the TCCS ECT.

b. Measure the resistance between S1 , S2 , SL and ground.

Resistance:  11-15 ohms.

c. Apply battery voltage to each terminal. Check that an operation noise can be heard from the solenoid.

2. CHECK SOLENOID SEALS.

If there is foreign material in the solenoid valve, there will be no fluid control even with solenoid operation.

a. Check No. 1 and No. 2 solenoid valves.

-

Applying 5 kg/cm2 (71 psi, 490 kPa) of compressed air, check that the solenoid valves open do not leak the air.

-

When supply battery voltage to the solenoids, check that the solenoid valves open.

b. Check the lock-up solenoid valve.

-

Applying 5 kg-cm2 (71 psi, 490 kPa) of compressed air, check that the solenoid valve opens.

-

When supply battery voltage to the solenoid, check that the solenoid valve does not leak the air.

Shift Linkage, A/T > < Solenoid No. 1(+++)|Page 2295