toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Sunroof / Moonroof Relay > < Sunroof / Moonroof Limit Switch|Testing and Inspection
Page 1
background image

Sunroof / Moonroof Motor: Testing and Inspection

SLIDING ROOF MOTOR INSPECTION

INSPECT SLIDING ROOF MOTOR OPERATION

(a)  Connect the positive (+) lead from the battery to terminal 3 and the negative (-) lead to terminal 1, check that the motor turns counter-clockwise

(moves to the close side).

(b) Reverse the polarity and check that the motor turns to clockwise (moves to the open side).

If operation is not as specified. replace the motor.

INSPECT CIRCUIT BREAKER OPERATION

(a)  With the sliding roof in the fully opened position. hold the sliding roof switch in "OPEN" position and check that there is a circuit breaker

operation noise within 10 to 60 seconds.

(b) With the sliding roof in fully opened position, hold the sliding roof switch in "CL0SE" position and check that the sliding roof begins to close

within 60 seconds. 

If operation is not as specified. replace the motor.

Sunroof / Moonroof Relay > < Sunroof / Moonroof Limit Switch|Testing and Inspection