toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Leak Detection Solenoid, Evaporative System > < Vapor Pressure Sensor|Page 4114
Page 1
background image

Vapor Pressure Sensor: Testing and Inspection
VSV For Vapor Pressure Sensor

1. REMOVE VSV
2. INSPECT VSV

a. Inspect the VSV for open circuit.

Using an ohmmeter, check that there is continuity between the terminals.
Resistance: 33 - 39 Ohms at 20° C (68° F)
If there is no continuity, replace the VSV.

b. Inspect the VSV for ground.

Using an ohmmeter, check that there is no continuity between each terminal and the body.
If there is continuity, replace the VSV.

c. Inspect the VSV operation.

1. Check that air flows from ports E to G.

2. Apply battery positive voltage across the terminals.
3. Check that air flows from ports E to F. If operation is not as specified, replace the VSV.

3. REINSTALL VSV

Leak Detection Solenoid, Evaporative System > < Vapor Pressure Sensor|Page 4114