toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

All Technical Service Bulletins for Sunroof / Moonroof Track: > < Sunroof - Sliding Rail Rattle
Page 2
background image

Field-Fix Procedures

Verify the concern by either road test or static check (static check is to open moon roof approximately 100 mm, then tap lightly by hand on front edge of
panel).

If a rattle exists, correct this condition by following the field-fix procedures outlined below:

^

Remove the moon roof glass panel by first removing the black plastic covers at the base of the moon roof glass on both right and left sides.

NOTE

This must be done from Inside the vehicle.

^

Remove the (4) attaching torx head screws holding the moon roof glass panel in place.

^

Carefully remove the moon roof glass panel and store it in the trunk while making repairs.

^

Use the electric switch to place the assembly in the TILT UP position.

^

Clean the light gray rubber stop, with a VOC compliant wax and grease remover approved for use in your area. (Check local regulations.)

^

Place adhesive back felt tape (W: 10 mm, L: 15 mm, T: 5 mm) on the rubber stop (both sides).

^

Apply high viscosity grease (P/N 00289-1WG00 or equivalent) to the front shoe pin.

^

Engage the electric switch returning the assembly to the neutral position.

^

Reinstall the moon roof glass panel and make the appropriate flushness adjustments before tightening the attaching screws.

Flush adjustment specifications:
 

+/- 1.5 mm at front (overflush) 

0 + 1.5 mm at rear (overflush) 

0 - 1.0 mm at rear (underflush)

^

Engage the electric switch moving the moon roof panel rearward approximately 100 mm.

^

Check for a rattle by tapping lightly (static check) on the front edge of the moon roof glass panel.

^

Torque the attaching screws according to the repair manual.

^

Reinstall the plastic covers.

Test drive the vehicle to confirm no noise exists.

All Technical Service Bulletins for Sunroof / Moonroof Track: > < Sunroof - Sliding Rail Rattle