Celica L4-1.8L (1ZZ-FE) (2004)
a. Temporarily install the new parts and measure each part in accordance with the body dimension diagram.
3. APPLYING SEALER TO THE ENGINE COMPARTMENT
4. APPLYING UNDERCOATING
5. APPLYING ANTI-RUST AGENT
a. After applying the top coat layer, apply the anti-rust agent to the inside of the necked section structural weld spots.