Celica L4-1.8L (1ZZ-FE) (2004)
7. 2ZZ-GE:
INSPECT KNOCK SENSOR
Using an ohmmeter, measure the resistance between terminals.
Resistance: 120 - 280 KOhm at 20 °C (68 °F).
If the resistance is not specified, replace the sensor.
8. 1ZZ-FE:
REINSTALL KNOCK SENSOR
a. Using SST, install the knock sensor.
SST 09816-30010
b. Connect the knock sensor connector.
9. 2ZZ-GE:
REINSTALL KNOCK SENSOR
a. Install the knock sensor with the nut.
b. Connect the knock sensor connector.
10. REINSTALL INTAKE MANIFOLD
11. REINSTALL RADIATOR RESERVOIR
12. REINSTALL THROTTLE BODY