Celica GT-S L4-1.8L (2ZZ-GE) (2000)
C.
If you removed both camshafts, install and uniformly tighten the 20 bearing cap bolts. After tightening the No. 1 camshaft bearing cap hand
tight, tighten the rest in several passes, in the sequence shown. (Figure 30.)
Torque: 18.5 N.m (189 kgf.cm, 14 ft.lbf)
D.
If it was only necessary to remove the intake camshaft, install and uniformly tighten the 10 bearing cap bolts. After tightening the No. 1
camshaft bearing cap hand tight, tighten the rest in several passes, in the sequence shown. (Figure 31.)
Torque: 18.5 N.m (189 kgf.cm, 14 ft.lbf)
18.
Install camshaft timing sprocket.
A.
Align the knock pin hole in the exhaust camshaft timing sprocket with the knock pin of the camshaft. (Figure 32.)
B.
Temporarily install the timing sprocket bolt.