Celica GT-S L4-1.8L (2ZZ-GE) (2000)
d) Connect the 2 wire harness clamps from the floor shift assembly.
e) Connect the 2 connector.
2. INSTALL KEY INTERLOCK CABLE
a) Pass the key interlock cable end through the hole in the floor shift assembly.
HINT: Make sure that the claws shown by the arrow in the illustration are locked.
b) With the shift lever in N position, set the hole of the cable end to the floor shift assembly to assemble them.
c) At the time of reassembly:
With the key in ACC, push a claw into lock key.
At this time, be careful not to apply undue force on bending to the cable (Cable length adjustment is completed).
HINT: Check that the key lock cam is contact with the cam stopper.
d) With the key in ACC, install the cable cap claw to the key interlock.
e) Connect the 2 key interlock cable clamps.
f) Pull in the cable while pressing the clip of the key interlock cable.
3. INSTALL AIR CONDITIONING UNIT
4. INSTALL INSTRUMENT PANEL