Celica Liftback L4-107.5 1762cc 1.8L DOHC (7A-FE) (1995)
5. INSTALL NO.2 AND NO.3 TIMING BELT COVERS
-
Install the No.2 and No.3 timing belt covers with the 6 bolts.
6. INSTALL CYLINDER HEAD COVER
(a) Remove any old packing (FIPG) material.
(b) Apply seal packing to the cylinder head as shown in the illustration.
Seal packing: Part No.08828-00080 or equivalent
(c) Install the gasket to the cylinder head cover.
(d) Install the cylinder head cover with the 4 seal washers and 4 cap nuts.
Uniformly tighten the cap nuts in several passes.
Torque: 5.9 N.m (60 kgf.cm, 52 in.lbf)
(e) Connect the PCV hoses to the cylinder head cover.