toyota Workshop Repair Guides

Toyota Celica Liftback DOHC Turbo Workshop Service and Repair Manuals

Timing Belt Removal|Page 512 > < Timing Belt Removal|Page 510
Page 9
background image

Torque:  52 N.m (530 kgf.cm, 38 ft.lbf)

19. Install RH engine mounting insulator.

Install the mounting insulator with the through bolt and two nuts

Torque:

Through bolt

87 N.m (890 kgf.cm, 64 ft.lbf)

Nut

52 N.m (530 kgf.cm, 38 ft.lbf)

20. Install RH engine mounting stay.

Install the mounting stay with the bolt and nut.

Torque:  73 N.m (740 kgf.cm, 54 ft.lbf)

21. Install PS drive belt.

Install the drive belt with the pivot bolt and adjusting bolt.

22. Install throttle body.
23. Install EGR valve and pipe.
24. Install EGR vacuum modulator and VSV.
25. Install charge air cooler.
26. Install generator. 
27. Install RH engine under cover.
28. Connect cable to negative terminal of battery.
29. Check and adjust drive belts.

Alternator belt tension:

With A/C

New belt 165 ± 10 lbf
Used belt 84 ± 15 lbf

Without A/C

New belt 150 ± 25 lbf
Used belt 130 ± 20 lbf

Timing Belt Removal|Page 512 > < Timing Belt Removal|Page 510