Celica Liftback L4-122 1998cc 2.0L DOHC Turbo (3S-GTE) (1992)
Test Setup
- Install two unions to the injector and delivery pipe with four new gaskets and the union bolts.
Torque: 12 N.m (125 kgf.cm, 9 ft.lbs)
- Connect hose to the unions.
- Connect wire to the injector.
- Put a container under the injector.
Jumper Installation
- Using a jumper wire, connect terminals +B and FP of the check connector.
- Reconnect the battery negative (-) cable.
- Turn the ignition switch ON.
NOTICE: Do not start the engine.
Checking Injector Operation
- Connect the test probes to the battery, and check that the fuel spray is as shown.