Celica Liftback L4-122 1998cc 2.0L DOHC Turbo (3S-GTE) (1992)
Cold Start Injector Time Switch: Description and Operation
Start Injector Time Switch Circuit
PURPOSE
The start injector time switch controls operation of the cold start injector.
LOCATION
Threaded into the water jacket, near the distributor.
OPERATION
Operation is controlled by the start injector time switch. At coolant temperatures below 59°F (15°C), starter voltage is passed to the injector. To
avoid engine flooding, operation is typically less than 10 seconds.