toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Throttle Opener <--> [Idle Speed/Throttle Actuator - Mechanical] > < Idle Speed/Throttle Actuator - Electronic|Locations|Page 1533
Page 2
background image

Checking ISC Operation

Inspect ISC Valve Operation

- Connect the positive (+) lead from the battery to terminal +B and negative (-) lead to terminal RSC and check that the valve is closed.

Checking ISC Operation

- Connect the positive (+) lead from the battery to terminal +B and negative (-) lead to terminal RSO, and check that the valve is open.
- If any step fails to provide the indicated results, replace ISC valve.

Throttle Opener <--> [Idle Speed/Throttle Actuator - Mechanical] > < Idle Speed/Throttle Actuator - Electronic|Locations|Page 1533