Corolla L4-1.8L (2ZZ-GE) (2005)
a. Install the air cleaner cap together with the air cleaner hose.
b. Lock the 2 clamp hooks.
c. Tighten the air cleaner hose clamp bolt.
Torque: 2.0 Nm (20 kgf.cm, 18 in.lbf)
d. Connect the 3 vacuum hoses.
e. Connect the fuel vapor feed hose No. 3 to the VSV.
f.
Connect the fuel vapor feed hose No. 1 to the VSV.
g. Install the 2 wire harness clamps.
h. Connect the 2 VSV connectors.
i.
Connect the mass air flow meter connector.
13. INSTALL ACCELERATOR CONTROL CABLE ASSY
a. Install the accelerator control cable into the throttle lever.
b. Tighten the nut.
c. Install the accelerator control cable onto the accelerator control cable support No. 2.
14. CONNECT BATTERY NEGATIVE TERMINAL
Torque: 5.4 Nm (55 kgf.cm, 48 in.lbf)
15. ADD ENGINE COOLANT
16. CHECK FOR ENGINE COOLANT LEAKAGE
17. INSTALL CYLINDER HEAD COVER NO.2