toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3124 > < Initial Inspection and Diagnostic Overview|Page 3122
Page 83
background image

NOTICE:
*

The resistance must be measured after the CAN No. 2 junction connector is reconnected.

*

The resistance must be measured after the CAN No. 1 junction connector is disconnected.

Standard Resistance:

(d) Except TMC made:

(1) Measure the resistance according to the value(s) in the table below.

NOTICE:
*

The resistance must be measured after the CAN No. 2 junction connector is reconnected.

*

The resistance must be measured after the CAN No. 1 junction connector is disconnected.

Standard Resistance:

NG --  CHECK FOR SHORT TO GND IN CAN BUS WIRE (CAN NO. 1 JUNCTION CONNECTOR - POWER STEERING
ECU)
OK -- Continue to next step.

7. CHECK FOR SHORT TO GND IN CAN BUS WIRE (STEERING ANGLE SENSOR BRANCH WIRE)

(a) TMC made:

Initial Inspection and Diagnostic Overview|Page 3124 > < Initial Inspection and Diagnostic Overview|Page 3122