Corolla L4-2.4L (2AZ-FE) (2010)
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(c) Connect the terminal 50 connector to the starter assembly.
3. INSTALL BATTERY CARRIER See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
4. INSTALL BATTERY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine Assembly/Installation
5. INSTALL WIRE HARNESS
(a) Install the claw and wire harness.
6. INSTALL AIR CLEANER CASE See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
7. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE See: Powertrain Management/Fuel Delivery and Air Induction/Throttle
Body/Service and Repair/Installation
8. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Engine Assembly/Installation
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
HINT
See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Injector/Service and Repair/Installation