FJ Cruiser 2WD V6-4.0L (1GR-FE) (2008)
Drive/Propeller Shaft: Service and Repair
Reassembly
PROPELLER SHAFT: REAR PROPELLER SHAFT ASSEMBLY: REASSEMBLY
REASSEMBLY
1. INSTALL REAR PROPELLER SHAFT UNIVERSAL JOINT SPIDER KIT
(a) Apply MP grease to a new spider and spider bearings.
(b) Fit the spider into the flange yoke.
(c) Using SST, install the spider bearings onto the spider.
SST: 09332-25010
(d) Using SST, adjust both bearings so that the snap ring grooves are at maximum and equal in width.
SST: 09332-25010
(e) Install 4 new snap rings of equal thickness which will allow no axial play.
HINT: Do not reuse the snap rings.
Thickness of snap ring