FJ Cruiser 4WD V6-4.0L (1GR-FE) (2007)
(c)
Align the orange mark links with the timing marks of the camshaft timing gears, and install the chain.
4. INSTALL NO. 2 CHAIN VIBRATION DAMPER
(a)
Install the 2 No. 2 chain vibration dampers.
5. INSTALL IDLE SPROCKET ASSEMBLY
(a)
Apply a light coat of engine oil to rotating surface of the No. 1 idle gear shaft.
(b) Temporarily install the No. 1 idle gear shaft together with the No. 2 idle gear shaft with the knock pin of the No. 1 idle gear shaft and the
knock pin groove of the cylinder block are aligned.
NOTICE: Orient the idle gear shafts correctly.
(c)
Using a 10 mm hexagon wrench, tighten the No. 2 idle gear shaft.
Torque: 60 N*m (612 kgf*cm, 44 ft.*lbf.)
(d) Remove the bar from the chain tensioner.
6. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL
7. INSTALL TIMING CHAIN OR BELT COVER SUB-ASSEMBLY
(a)
Remove any old packing (FIPG) material.
HINT: Do not drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.