FJ Cruiser 4WD V6-4.0L (1GR-FE) (2007)
INSTALLATION
1. INSTALL CLUTCH START SWITCH ASSEMBLY
(a)
Install the clutch start switch assembly with the nut.
Torque: 16 N*m (160 kgf*cm, 12 ft.*lbf)
(b) Connect the clutch start switch assembly connector.
2. INSPECT CLUTCH START SWITCH ASSEMBLY