FJ Cruiser 4WD V6-4.0L (1GR-FE) (2007)
REASSEMBLY
1. INSTALL SHIFT SOLENOID VALVE
(a)
Install the shift solenoid valve S2 with the bolt.
Torque: 10 N*m (100 kgf*cm, 7 ft.*lbf)
(b) Install the shift solenoid valve S1 with the bolt.
Torque: 6.4 N*m (65 kgf*cm, 56 in.*lbf)
(c)
Install the shift solenoid valve SR with the 2 bolts.
Torque: 6.4 N*m (65 kgf*cm, 56 in.*lbf)
(d) Install the shift solenoid valves SLU and SL2 with the 2 pins, lock plate and bolt.
Torque: 6.4 N*m (65 kgf*cm, 56 in.*lbf)
(e)
Install the shift solenoid valves SLT and SL1 with the 2 pins, lock plate and bolt.
Torque: 6.4 N*m (65 kgf*cm, 56 in.*lbf)
INSTALLATION
1. INSTALL TRANSMISSION VALVE BODY ASSEMBLY
(a)
Insert the pin of the lever into the hole of the manual valve.