Highlander 2WD L4-2.4L (2AZ-FE) (2001)
Torque: 29 N.m (300 kgf.cm, 21 ft.lbf)
40. INSTALL INSTRUMENT PANEL BRACE SUB-ASSEMBLY NO.1
a. Install the instrument panel brace sub-assembly No.1, 2 bolts and 2 nuts.
Torque: 29 N.m (300 kgf.cm, 21 ft.lbf)
41. INSTALL FLOOR SHIFT ASSEMBLY
a. Install the 4 nuts and floor shift assembly.
Torque: 20 N.m (200 kgf.cm, 14 ft.lbf)
b. Install the 2 nuts and shift cable.
Torque: 20 N.m (200 kgf.cm, 14 ft.lbf)