Highlander 2WD L4-2.4L (2AZ-FE) (2001)
36. INSTALL SKID CONTROL ECU ASSEMBLY
a. Install the 2 nuts and skid control ECU assembly.
Torque: 5.0 N.m (50 kgf.cm, 43 in.lbf)
37. INSTALL INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
a. Install the instrument panel junction block assembly, bolt and 2 nuts.
Torque: 8.4 N.m (86 kgf.cm, 74 in.lbf)
38. INSTALL ECM
a. Install the ECM and 2 nuts.
Torque: 5.5 N.m (56 kgf.cm, 49 in.lbf)
39. INSTALL INSTRUMENT PANEL BRACE SUB-ASSEMBLY NO.2
a. Install the instrument panel brace sub-assembly No.2, 2 bolts and 2 nuts.