toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Evaporator Case|Service and Repair|Page 4478 > < Evaporator Case|Service and Repair|Page 4476
Page 15
background image

40. INSTALL INSTRUMENT PANEL BRACE SUB-ASSY NO.1

a. Install the instrument panel brace sub-assy No.1, 2 bolts and 2 nuts.

Torque: 29 N.m (300 kgf.cm, 21 ft.lbf)

41. INSTALL FLOOR SHIFT ASSY

a. Install the 4 nuts and floor shift assy.

Torque: 20 N.m (200 kgf.cm, 14 ft.lbf)

b. Install the 2 nuts and shift cable.

Torque: 20 N.m (200 kgf.cm, 14 ft.lbf)

42. INSTALL STEERING COLUMN ASSY

a. Install the steering column assy, 2 bolts and 2 nuts. 

Torque: 21 N.m (210 kgf.cm, 15 ft.lbf)

Evaporator Case|Service and Repair|Page 4478 > < Evaporator Case|Service and Repair|Page 4476