toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Fuel Pressure Pulsation Damper > < Fuel System - Fuel Injector Cleaning Procedure|Page 2501
Page 2
background image

a. Install the fuel pipe No.1 with the 2 new pulsation damper gaskets and the pulsation damper.

Torque: 33 N.m (336 kgf.cm, 24 ft.lbf)

b. Install the delivery pipe with 2 new fuel pipe No.1 gaskets and a bolt to the fuel pipe No.1.

Torque: 33 N.m (336 kgf.cm, 24 ft.lbf)

c. Install the fuel pipe No.1 to the intake manifold with a bolt.

Torque: 20 N.m (204 kgf.cm, 15 ft.lbf)

12. INSTALL INTAKE AIR SURGE TANK
13. INSTALL FRONT SUSPENSION BRACE SUB-ASSY UPPER CENTER 

Torque: 80 N.m (816 kgf.cm, 59 ft.lbf)

14. INSTALL AIR CLEANER ASSEMBLY WITH HOSE
15. INSTALL V-BANK COVER
16. ADD COOLANT
17. INSPECT CHECK FOR ENGINE COOLANT LEAKS
18. INSPECT FOR FUEL LEAKS

Fuel Pressure Pulsation Damper > < Fuel System - Fuel Injector Cleaning Procedure|Page 2501