toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Component Inspection|Page 3454 > < Component Inspection|Page 3452
Page 1
background image

Variable Valve Timing Actuator: Service and Repair

REMOVAL

1. REMOVE ENGINE ROOM SIDE LH COVER
2. REMOVE AIR CLEANER CAP W/ INLET
3. REMOVE AIR CLEANER CASE W/ RESONATOR

4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)

a. Disconnect the oil control valve connector.
b. Remove the bolt and oil control valve.

5. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)

a. Disconnect the oil control valve connector.
b. Remove the bolt and oil control valve.

INSTALLATION

1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)

a. Apply a coat of engine oil to an O-ring of the sensor.
b. Install the camshaft timing oil control valve with the bolt.

Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)

c. Connect the camshaft timing oil control valve connector.

Component Inspection|Page 3454 > < Component Inspection|Page 3452