Highlander 2WD V6-3.3L (3MZ-FE) Hybrid (2006)
c. Connect the 2 power steering ECU assembly connectors and securely lock the connectors.
d. Install the ground cable terminal to the power steering ECU assembly with the bolt.
Torque: 6.0 Nm (61 kgf-cm, 53 inch lbs.)
2. INSTALL INVERTER BRACKET NO.5
a. Install the inverter bracket No.5 to the power steering ECU assembly with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft. lbs.)
3. INSTALL ENGINE COMPARTMENT SIDE COVER LH
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
5. PERFORM INITIALIZATION
HINT: Some systems need initialization when disconnecting the cable from the negative battery terminal.
6. INITIALIZE ROTATION ANGLE SENSOR AND CALIBRATE TORQUE SENSOR ZERO POINT.