toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Electrical Specifications|Page 3168 > < Electrical Specifications|Page 3166
Page 5
background image

e. Install 6 new insulators and the 4 delivery pipe No. 1 spacers to the intake manifold.
f.

Place the 2 fuel delivery pipes and 6 fuel injectors together on the intake manifold.

NOTE:  Be careful not to drop the fuel injectors when installing the fuel delivery pipe.

g. Temporarily install the 4 bolts which are used to attach the fuel delivery pipe to the intake manifold.

NOTE:  After installing the fuel injector, check that it turns smoothly. If not, reinstall it with a new O-ring.

h. Tighten the 4 bolts.

Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)

i.

Connect the 6 fuel injector connectors.

11. INSTALL FUEL PIPE SUB-ASSY NO.1

a. Install 2 new gaskets and the fuel pipe No. 2 union bolt.

Torque: 33 N.m (337 kgf.cm, 24 ft.lbf)

b. Install 2 new gaskets and the fuel pressure pulsation damper.

Torque: 33 N.m (337 kgf.cm, 24 ft.lbf)

c. Install the fuel pipe No. 1 with the bolt.

Torque: 20 N.m (204 kgf.cm, 15 ft.lbf)

12. INSTALL INTAKE AIR SURGE TANK

a. Install a new gasket to the intake air surge tank.
b. Install the intake air surge tank and emission control valve bracket with the 2 nuts.

Torque: 28 N.m (286 kgf.cm, 21 ft.lbf)

c. Using a socket hexagon wrench 8, tighten the 4 bolts.

Torque: 28 N.m (286 kgf.cm, 21 ft.lbf)

d. Install the surge tank stay No. 2 with the 2 bolts.

Torque: 20 N.m (204 kgf.cm, 15 ft.lbf)

e. Install the surge tank stay No. 1 with the 2 bolts.

Torque: 20 N.m (204 kgf.cm, 15 ft.lbf)

f.

Install the engine hanger No. 1 with the 2 bolts.

Torque: 20 N.m (204 kgf.cm, 15 ft.lbf)

g. Install the pressure feed tube with the 3 nuts.

Torque: 7.8 N.m (80 kgf.cm, 69 in.lbf)

Electrical Specifications|Page 3168 > < Electrical Specifications|Page 3166