toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2208 > < Initial Inspection and Diagnostic Overview|Page 2206
Page 14
background image

Steps 1 - 2

INSPECTION PROCEDURE

Ignition Switch Power Source Circuit

CIRCUIT DESCRIPTION

When the ignition switch is turned to the ACC position, battery positive voltage is applied to the terminal ACC of the ECU and when the ignition switch
is turned to the ON position, battery positive voltage is applied to the terminal SIG of the ECU.

Initial Inspection and Diagnostic Overview|Page 2208 > < Initial Inspection and Diagnostic Overview|Page 2206