toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Fuel Injector|Removal|Page 2720 > < Fuel Injector|Removal|Page 2718
Page 5
background image

17. Install bolt holding heater in let pipe and air intake chamber.

Torque:  20 Nm (14 ft lb) 

18. Install exhaust gas recirculation valve and vacuum modulator.

-

Temporarily install a new gasket, and exhaust gas recirculation valve and vacuum modulator assembly with the 2 stud bolts.

Torque:  10 Nm (8 ft lb) 

-

Install the 2 nuts holding the exhaust gas recirculation valve to the air intake chamber.

Torque:  19 Nm (14 ft lb) 

-

Tighten the union nut of the exhaust gas recirculation pipe.

Torque:  64 Nm (47 ft lb) 

-

Connect the exhaust gas recirculation gas temperature sensor connector.

-

Connect the 3 vacuum hoses.

19. Connect throttle cable.

Fuel Injector|Removal|Page 2720 > < Fuel Injector|Removal|Page 2718