Landcruiser 4WD L6-4.5L (1FZ-FE) (1993)
17. Install bolt holding heater in let pipe and air intake chamber.
Torque: 20 Nm (14 ft lb)
18. Install exhaust gas recirculation valve and vacuum modulator.
-
Temporarily install a new gasket, and exhaust gas recirculation valve and vacuum modulator assembly with the 2 stud bolts.
Torque: 10 Nm (8 ft lb)
-
Install the 2 nuts holding the exhaust gas recirculation valve to the air intake chamber.
Torque: 19 Nm (14 ft lb)
-
Tighten the union nut of the exhaust gas recirculation pipe.
Torque: 64 Nm (47 ft lb)
-
Connect the exhaust gas recirculation gas temperature sensor connector.
-
Connect the 3 vacuum hoses.
19. Connect throttle cable.