Landcruiser AWD L6-4.5L (1FZ-FE) (1997)
(d) Position the injector connector upward.
(e) Place 6 new insulators and the 3 spacers in position on the intake manifold.
(f) Place the 6 injectors together with the delivery pipe in position on the intake manifold.
(g) Temporarily install the 3 bolts holding the delivery pipe to the intake manifold.
(h) Check that the injectors rotate smoothly.
HINT: If injectors do not rotate smoothly, the probable cause is incorrect installation of O-rings. Replace the O-rings.
(i) Position the injector connector upward.
(j) Tighten the 3 bolts holding the delivery pipe to the intake manifold.
Torque: 21 N.m (210 kgf.cm, 15 ft.lbf)
(k) Connect the 6 injector connectors as shown.