Landcruiser AWD L6-4.5L (1FZ-FE) (1997)
7. Install intake manifold stay.
Install the intake manifold stay with the 2 bolts.
Torque: 36 N.m (360 kgf.cm, 26 ft.lbf)
8. Connect ground strap.
9. Install engine oil dipstick.
10. Connect PS reservoir tank.
Connect the reservoir tank with the 3 bolts.
Torque: 18 N.m (185 kgf.cm, 13 ft.lbf)
11. Connect EGR gas temp. sensor connector.
12. Connect connector for emission control valve set assembly.
13. Connect idle air control valve connector.
14. Connect throttle position sensor connector.
15. Connect brake booster hose.
16. Connect EVAP hose.
17. Connect no. 2 water bypass hose.