toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Components|Page 4105 > < Components|Page 4103
Page 1
background image

Shift Cable: Service and Repair
Installation

U341E AUTOMATIC TRANSMISSION / TRANSAXLE: TRANSMISSION CONTROL CABLE: INSTALLATION

1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

NOTICE:
Before installing the transmission control cable assembly, check that the park/neutral position switch and the shift lever are in
neutral.

(a) Put the transmission control cable into the cabin and connect the transmission control cable with the 2 nuts.

Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)

(b) Install the transmission control cable support with the nut.

Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)

(c) Connect the transmission control cable to the control cable bracket.

(d) Connect the transmission control cable to the bracket with a new clip.

(e) Connect the transmission control cable assembly to the control shaft lever with the nut.

Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)

Components|Page 4105 > < Components|Page 4103