toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Starter Motor > < Components|Page 4935
Page 2
background image

(i) Using a screwdriver, stake the nut with the lock plate.

(j) Install the control shaft lever with the washer and nut.

Torque: 13 Nm (130 kgf-cm, 9 ft-lbf)

(k) Connect the park/neutral position switch connector.

2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY

(a) Connect the transmission control cable to the bracket with a new clip.
(b) Connect the transmission control cable assembly to the control shaft lever with the nut.

Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)

3. INSTALL BATTERY CARRIER See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine

Assembly/Installation

4. INSTALL BATTERY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine Assembly/Installation
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and

Replacement/Engine Assembly/Installation

6. INSPECT SHIFT LEVER POSITION See: Transmission and Drivetrain/Automatic Transmission/Transaxle/Shift Linkage/Shift

Cable/Adjustments

7. ADJUST SHIFT LEVER POSITION See: Transmission and Drivetrain/Automatic Transmission/Transaxle/Shift Linkage/Shift Cable/Adjustments
8. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY See: Testing and Inspection/On-Vehicle Inspection

Starter Motor > < Components|Page 4935