Matrix FWD L4-2.4L (2AZ-FE) (2009)
Shift Cable: Service and Repair
Installation
U250E AUTOMATIC TRANSMISSION / TRANSAXLE: TRANSMISSION CONTROL CABLE: INSTALLATION
INSTALLATION
1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
NOTE: Before installing the transmission control cable assembly, check that the park/neutral position switch and the shift lever are in neutral.
(a) Put the transmission control cable into the cabin and connect the transmission control cable with the 2 nuts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Install the transmission control cable support with the nut.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(c) Connect the transmission control cable to the control cable bracket.
(d) Connect the transmission control cable to the bracket with a new clip.
(e) Connect the transmission control cable assembly to the control shaft lever with the nut.
Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)
(f) Turn the nut of the transmission control cable 180° counterclockwise. While holding the nut in place, push in the stopper until the stopper
clicks twice.