Matrix XR 2WD L4-1.8L (1ZZ-FE) (2003)
8. INSTALL FLOOR SHIFT SHIFT LEVER ASSY
a. Install the shift lever assy with the 4 nuts.
Torque: 12 Nm (120 kgf-cm, 9 ft. lbs.)
9. CONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SHIFT
a. Connect the shift cable with the clip to the shift lever assy.
NOTICE:
^
The projecting part of the cable outer should face upward when the shift cable is installed.
^
Make sure that after installation the cable outer spring is moved to the place shown in the illustration.
b. Connect the shift cable end as shown in the illustration.
c. Install the washer and clip.
10. CONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SELECT
a. Connect the select cable with the clip to the shift lever assy.
NOTICE:
^
The projecting part of the cable outer should face upward when the shift cable is installed.
^
Make sure that after installation the cable outer spring is moved to the place shown in the illustration.