MR2 L4-122 1998cc 2.0L DOHC Turbo (3S-GTE) (1991)
Install the mounting bracket with the three or four bolts.
Torque: 61 N-m (620 kg.cm., 45 ft.lb.).
22. Install RH engine mounting insulator.
Install the mounting insulator with the through bolt and two nuts.
Torque:
Nut: 52 N-m (530 kg.cm., 38 ft.lb.).
Through bolt:
78 N-m (800 kg.cm., 58 ft.lb.).
HINT: Raise the jack and perform the operation with the engine fully up.
23. Install RH engine mounting stay.
Install the mounting stay with the two bolts and nut.
Torque: 73 N-m (740 kg.cm., 54 ft.lb.).
24. Install alternator drive belt.