MR2 L4-122 1998cc 2.0L DOHC Turbo (3S-GTE) (1991)
Power Steering Relay: Testing and Inspection
Fig. 25 Power Steering Relay Inspection.
1.
Inspect relay continuity as shown in Fig. 25.
2.
Connect positive battery voltage to terminal MRLY and negative to terminal GND.
3.
Ensure continuity between terminals +B and MB.