MR2 L4-122 1998cc 2.0L DOHC Turbo (3S-GTE) (1991)
If the preload is not within specification, select the thrust washers.
HINT: The total preload will change about 1 - 2 kg-cm (0.9 - 1.7 in.-lb, 0.1 - 0.2 N-m) with each shim thickness.
17. REMOVE REAR BEARING RETAINER
Using torx wrench, remove the seven torx screws and rear bearing retainer.
Torx wrench T45 09042-00050
18. REMOVE SHIM
19. REMOVE TRANSMISSION CASE
Remove the seventeen bolts and tap off the case with a plastic hammer.
20. REMOVE OUTPUT SHAFT ASSEMBLY
21. REMOVE DIFFERENTIAL CASE ASSEMBLY