toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Shift Linkage, A/T > < Shift Solenoid, A/T|Locations
Page 1
background image

Shift Solenoid: Testing and Inspection

INSPECT SOLENOID 

(a) Disconnect the connector from the ECT computer.
(b) Measure the resistance between S1, S2, SL, S4 and ground.

STD: 11 - 15 ohms 

(c) Apply battery voltage to the solenoid.

Check that an operation noise can be heard from the solenoid.

NOTE: If there is foreign material in the solenoid valve, there will be no fluid control even with solenoid operation.

Shift Linkage, A/T > < Shift Solenoid, A/T|Locations