toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Blower Motor Relay > < Cool Box|Page 2586
Page 5
background image

7. INSTALL RIGHT AND LEFT AIR FILTERS TO LOWER CASE
8. INSTALL RIGHT AND LEFT SUCTION GRILLS. AND REGISTER GRILL TO LOWER CASE

INSTALLATION OF COOLING UNIT

1. INSTALL REAR COOLING UNIT ON ROOF

(a) Fit the three pawls of the cooling unit into the roof groove.

(b) Install and tighten the five bolts.
(c) Install the four blind Covers.

2. CONNECT SUCTION TUBE TO COOLING UNIT OUTLET FITTING

Torque:  230 ± 20 kg-cm (17 ± 1.4 ft-lb. 23 ± 2.0 N.m)

3. CONNECT LIQUID LINE TUBE TO COOLING UNIT INLET FITTING

Torque:  140 ± 10 kg-cm (10 ± 0.7 ft-lb. 14 ± 1.0 N.m)

4. IF EVAPORATOR WAS REPLACED. ADD COMPRESSOR OIL TO COMPRESSOR

Add 40 - 50 cc (1.4 1.7 ft. oz.
Compressor oil:  DENSOOIL 6, SUNISO No.5 GS or equivalent

5. CONNECT RIGHT AND LEFT DRAIN HOSES
6. CONNECT NEGATIVE CABLE TO BATTERY
7. EVACUATE AIR FROM AIR CONDITIONING SYSTEM
8. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT AND CHECK FOR GAS LEAKAGE 

Specified amount: 1.200 ± 5Og (42.32 1 1.76 Oz.)

Blower Motor Relay > < Cool Box|Page 2586