Previa Van DX 4WD L4-2438cc 2.4L DOHC SC MFI (1997)
(a) Place a new O-ring into the groove of timing chain case.
(b) Install the oil pump cover with the 9 screws.
Torque: 10 Nm (105 kg.cm, 8 ft. lbs.)
2. Install crankshaft pulley. Refer to Timing Components.
3. Install equipment drive shaft. Refer to Drive Belts, Mounts, Brackets and Accessories.
4. Install engine under covers.