toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Power Door Lock Relay > < Power Door Lock Actuator|Locations|Page 6484
Page 2
background image

c. Disconnect the leads from terminals.
d. After approximately 60 seconds, connect the positive (+) lead from the battery to terminal 4 and the negative (-) lead to terminal 2 and check

that the door lock moves to LOCK position.

If operation is not as specified, replace the door lock assembly.

Using an ammeter with a current - measuring probe:
a. Connect the positive (+) lead from the battery to terminal 2 and the negative (-) lead to terminal 4.
b. Attach a current-measuring probe to either the positive (+) lead or the negative (-) lead, and check that the current changes from approximately

3.2 A to less than 0.5 A within 20 to 70 seconds.

c. Disconnect the leads from terminals.
d. After approximately 60 seconds, reverse the polarity, and check that the door lock moves to the LOCK position.

If operation is not as specified, replace the door lock assembly.

HINT:  Inspect PTC thermistor operation of other door lock motors the same way as for the front door.

Power Door Lock Relay > < Power Door Lock Actuator|Locations|Page 6484