toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Panel Dimming Relay|Testing and Inspection|Page 6761 > < Panel Dimming Relay|Testing and Inspection
Page 2
background image

Meter Circuit

INSPECT LIGHT CONTROL RHEOSTAT OPERATION

1. Connect terminals 1 and 3 through a 3.4 W test bulb.
2. Connect the positive (+) lead from the battery to terminal 1 and the negative (-) lead to terminal 2.
3. Turn the rheostat dial fully down to check that the test bulb goes out.

Panel Dimming Relay|Testing and Inspection|Page 6761 > < Panel Dimming Relay|Testing and Inspection