Previa Van LE 4WD L4-2438cc 2.4L DOHC SC MFI (1997)
Meter Circuit
INSPECT LIGHT CONTROL RHEOSTAT OPERATION
1. Connect terminals 1 and 3 through a 3.4 W test bulb.
2. Connect the positive (+) lead from the battery to terminal 1 and the negative (-) lead to terminal 2.
3. Turn the rheostat dial fully down to check that the test bulb goes out.