toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Procedures|Page 2308 > < Procedures|Page 2306
Page 10
background image

(a) Install the reinforcement with the 2 bolts.

Torque: 13 Nm (133 kgf-cm, 10 ft-lbf)

6. INSTALL FRONT BUMPER CENTER STAY SUB-ASSEMBLY

(a) Install the stay with the 2 bolts.

Torque: 7.0 Nm (71 kgf-cm, 61 in-lbf)

7. CONNECT HORN CONNECTOR

(a) Connect the 2 horn connectors.

8. CONNECT WIRE HARNESS

(a) Attach the wire harness with the 4 clamps.
(b) Connect the 2 fan motor connectors.

9. CONNECT NO. 2 WATER BY-PASS HOSE

Procedures|Page 2308 > < Procedures|Page 2306