RAV4 2WD V6-3.5L (2GR-FE) (2006)
Step 38-39
INSPECTION PROCEDURE
NOTE:
-
Turn the ignition switch OFF before measuring the resistances of the main wire and the branch wire.
-
After the ignition switch is turned OFF, check that the key reminder warning system and light reminder warning system are not in operation.
-
Before measuring the resistance, leave the vehicle for at least 1 minute and do not operate the ignition switch, any switches or doors. If doors need
to be opened in order to check connectors, open the doors and leave them open.
HINT: Operating the ignition switch, any switches or any doors triggers related ECU and sensor communication with the CAN, which causes resistance
variation.
Short to GND In CAN Bus Line
Short to GND in CAN Bus Line
DESCRIPTION
There may be a short circuit between the CAN bus line and GND when there is resistance between terminals 6 (CANH) and 4 (CG) or terminals 14
(CANL) and 4 (CG) of the DLC3.