RAV4 4-Door 4WD L4-2.0L (3S-FE) (1997)
INSTALLATION
Installation is in the reverse order of removal.
-
Before installation, adjust length of Brake Booster push rod.
-
After installation, fill brake reservoir with brake fluid, bleed brake system. See: Brake Bleeding/Service and Repair
-
Check for leaks, check and adjust Brake Pedal.
With Manual Transmission
Master Cylinder
REMOVAL
1. Disconnect Level Warning Switch connector.