toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Component Inspection|Page 1110 > < Engine - MIL ON/DTC 1349 (VVTi Actuator) Set|Page 1107
Page 1
background image

Variable Valve Timing Actuator: Testing and Inspection
Component Inspection

INSPECTION

1. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE (OCV)

a. Disconnect the OCV connector.
b. Remove the bolt and OCV.
c. Remove the O-ring from the OCV.

2. INSPECT CAMSHAFT TIMING OIL CONTROL VALVE (OCV) OPERATION

Connect the positive (+) lead from the battery to terminal 1 and negative (-) lead to terminal 2, and check the movement of the valve.
If the operation is not as specified, replace the OCV.

3. REINSTALL CAMSHAFT OIL CONTROL VALVE (OCV)

a. Install a new O-ring to the OCV.
b. Install the OCV completely and tighten the bolt.

Torque: 9 N.m (90 kg.cm, 80 in.lb)

c. Connect the OCV connector.

Component Inspection|Page 1110 > < Engine - MIL ON/DTC 1349 (VVTi Actuator) Set|Page 1107