RAV4 4WD L4-2.0L (1AZ-FE) (2001)
Steps 1 - 2
INSPECTION PROCEDURE
Ignition Switch Power Source Circuit
CIRCUIT DESCRIPTION
When the ignition switch is turned to the ON position, battery voltage is applied to terminal IG of the passenger side J/B ECU.