RAV4 4WD L4-2.5L (2AR-FE) (2009)
-
After installing, check that the lock of the cable outer is protruding beyond portion A-A, as shown in the illustration.
(d) Connect the control cable to the shift lever.
NOTE: Connect the control cable so that the adjusting mechanism lock of the control cable is installed on the driver side of the vehicle.
(e) Fix the control cable onto the control cable bracket with the clip.
(f) Connect the control cable onto the control shaft lever with the nut.
Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)
(g) Connect the clamp of the control cable with the bolt.
Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)